One villa, built two ways.

The same villa, the same contractor, the same 13 months. Once without Vakeel and once with. Press play, or drag through the build month by month.

13 months, side by side

Without Vakeel, and with.

Red is the build without Vakeel, green is the same build with us. Each marker is a moment that changes the outcome.

Month 13
Without Vakeel
With Vakeel
Paid ahead of the work

AED 0AED 0

Problems covered up

00

When you learn it's late

Not yetNot yet

An illustration built on the sample villa (Villa A in Jumeirah Islands, an AED 6M renovation), not a real project and not a promise of what you'll save. Red is without Vakeel, green is with.

What made the difference

Four moments, four different outcomes.

None of them needed anyone to take over the build. They needed someone on site, on the owner's side, at the right moment.

Checked before it's covered

The bath 2 upstand measured 120 mm against 300, before the tiles went on. Fixed in a day.

A leak a year on avoided
Every bill checked

Payment application 4 claimed 62%. We verified 47%, so the owner paid for that and held the rest.

AED 901,875 not paid ahead
Variations priced against your contract

A tile change quoted at AED 26,000. Checked against the contract rates, AED 20,150 was fair.

AED 5,850 saved on one change
Delays seen early

The programme slipped 14 days. Seen weeks ahead, while it was still cheap to fix.

Weeks of warning, not none