On every visit: measured, photographed and tested, before anything is covered up.
We check your builder's work before you pay for it.
We visit your site every week, check every bill against the work actually done, and tell you what to pay and what to hold. You make the decisions. We make sure they're based on facts.
Free, 7 minutes, no obligation.
- Blockwork, ground floor211,250Measured on site, 20 Sep
- MEP containment195,000Photographed before closing
- Plaster, first floor250,250Measured, room by room
- MEP first fix, living room104,000Hold: pressure test on Tuesday
- Bath 2 waterproofing19,500Hold: upstand 120 mm, needs 300 mm
Sample villa. You pay your contractor directly; your money never passes through Vakeel.
Where villa builds usually go wrong.
Most owners only find out when it's expensive to fix. These are the four places it usually happens.Most owners only find out when it's expensive to fix.
You pay before anyone checks
The money moves before anyone independent confirms the work is there.
Hover
Mistakes get buried
Pipes and waterproofing disappear behind tiles within days. A bad joint shows up years later.
Hover
You can't judge the numbers
Three quotes, three scopes. The lowest often leaves the most out.
Hover
If you can't be there, you see what they show you
A photo is a crop, chosen by the people you're paying.
Hover
Why owners choose Vakeel.
Six things you get from the first visit, and what each one helps you avoid.
We check the work before you pay for it.
Every bill is checked against what we've measured and photographed. You get a clear answer: pay this much, hold this much, and why.
Helps you avoidPaying for work that isn't done.
We look before it's covered.
Waterproofing, structure, pipes and cables are inspected and photographed before they disappear behind tiles and gypsum.
Helps you avoidLeaks you'd otherwise find years later.
You see everything, live.
Time, money, quality and decisions on your phone, with the photos and tests behind every number.
Helps you avoidChasing people for updates.
You stay in charge.
You choose your contractor, your designer and your suppliers, and you make every decision. We give you the facts to make it.
Helps you avoidHanding the remote control to someone else.
Nobody pays us but you.
No commission, no preferred contractors, no kickbacks from suppliers. So our advice has no hidden angle.
Helps you avoidHidden margins built into your build.
A fixed fee you know upfront.
Set when you sign, from how often you want us on site. It doesn't rise when your build costs more.
Helps you avoidFees that grow with your project.
Why not just hire a project manager?
A project manager takes the work off your hands, and for some owners that's the right choice. But they usually pick your team, and referral fees are common. Here's where each option is stronger, including where we're not.For some owners a project manager is the right choice. Here's where each option is stronger, including where we're not.
Three things happen every week.
We check, you see, you decide. Your money and your instructions go straight to your contractor. Vakeel is copied, never in between.We check, you see, you decide. Vakeel is copied, never in between.
What to pay, what to hold and what to decide, with the photos and tests behind it.
Your yes and your money go straight to your contractor. Vakeel is copied, never in between.
What Vakeel never does: hold or move your money instruct your contractor on our own account recommend anyone take a fee from anyone but you
The bill said finished. The floor said otherwise.
An example of what one failed check is worth. Your contractor bills for the tiling; we find it isn't right; you hold the money until it is.What one failed check is worth: you hold the money until the work is right.
Passed
3 mm proud · 1 mm allowedCracked tile6 tiles sound hollowGap under the straight edgeFailed- 3 mm proud · 1 mm allowed
- Cracked tile
- 6 tiles sound hollow
- Gap under the straight edge
Drag across the photo to compare. A sample check on the sample villa: example photos, not from a real project.
- Week 12 · Payment application 3Your contractor bills the ground-floor tiling as complete.AED 64,000 claimed
- Week 12 · Our visit, the next morningThe check fails.
Edges up to 3 mm proud where 1 mm is allowed, six tiles sound hollow, one is cracked. Measured, photographed and on your dashboard the same afternoon.
- Week 12 · Your decisionYou hold the payment until it's fixed.
One tap on your phone. You send your contractor our photos and measurements, with us copied.
AED 64,000 held - Week 13 · Re-inspectedRelaid, flat and sound. Then you pay.
Your contractor relays the floor and we check it again. You pay for a floor that's right, once.
AED 64,000 paid, for finished work
See your build from anywhere, with the evidence.
This is what you'd see after every visit, on a sample villa in Jumeirah Islands. Choose Simple or Advanced, and pick a screen.What you'd see after every visit, on a sample villa. Simple or Advanced.
+14 days135 days to go
Planned 52% · verified 47% · paid 39%
Decide: master-bath tileSupplier cut-off
YouSite visit: pipe test, bath 29am, we attend
Payment 4: AED 123,500 heldUntil both tests pass
Held- Paid2.41M
- Due657k
- Held124k
- To build2.97M
Keep the specified tile
AED 0Change the tile We recommend
20,150After the screed it costs about 45,500.
LiveCAM 120 SEP 2026 · 10:42:07Second plaster gang started, north wall
14 people signed in
Bath 2 upstand rework started
Master-bath tile samples on site
- Paid2,405,000
- Verified, due656,500
- Held123,500
- Still to build2,965,950
Held until Tuesday's pressure test and the bath 2 flood test.
MEP first fix, ground floorLiving and bath 2 runs untested
188,50084,500Waterproofing, baths 2 and 3Bath 2 upstand too low
110,50091,000The specified tile was discontinued. Two options are on site as samples.
Keep the specified tile
AED 0Change to your selected tile We recommend
20,150+4 daysSame result at no cost, instead of variation V-05 at AED 11,050.
Before the scaffold comes down.
Laundry drainage moved
Agreed 52,000Two-coat waterproofing
Agreed 59,150Monthly site cleaning
Rejected 32,500+14 days135 days to go
Original 3 Feb 2027. A second plaster gang from 28 Sep aims to win back 5 days.
Pipe test and bath 2 re-check
Master-bath tiling, once the tile is decided
Ground-floor screeds, behind the flood test
Roof waterproofing, behind parapet render
The villa is sound and your money is protected, but the job is two weeks behind and one bathroom must be redone before tiling.
23 checks on this visit · 21 passed · 2 failed
1:04Week 15 walk-throughOne minute, six stopsConcrete, MEP first fix, windows, the ceiling before it closes, waterproofing, and our verdict.Plaster inspected, inside the recovery plan
Slab moisture 3.1%, screeds cleared
Blockwork measured, matches the claim to 0.4%
CAM 1 liveUptime 99.8%20 SEP 2026 · 10:42:07Material trolley through the entranceCAM 1 · access
Movement at the bath 2 workfaceCAM 3 · motion
Delivery at the gate, 6 minutesCAM 1 · access
CAM 2 offline 40 minutes, power isolatedCAM 2 · signal
Ceiling AED 6,337,500
MEP first fix, ground floorLiving and bath 2 runs untested
188,50084,500Waterproofing, baths 2 and 3Bath 2 upstand too low
110,50091,000| Claimed | Verified | Conf. | ||
|---|---|---|---|---|
| PA-1 | 601,250 | 601,250 | 100% | paid |
| PA-2 | 780,000 | 780,000 | 100% | paid |
| PA-3 | 1,023,750 | 1,023,750 | 100% | paid |
| PA-4 | 780,000 | 656,500 | 94% | open |
| PA-5 | 871,000 | 695,500 | 81% | forecast |
Ground-floor screeds, behind the flood test
Roof waterproofing, behind parapet render
Pipe test and bath 2 re-check
Master-bath tiling, once the tile is decided
A second plaster gang from 28 Sep aims to win back 5 of the 14 days.
The villa is sound and your money is protected, but the job is two weeks behind and one bathroom must be redone before tiling.
+14 days135 days to go
Planned 52% · verified 47% · paid 39%
Decide: master-bath tileSupplier cut-off
YouSite visit: pipe test, bath 29am, we attend
Payment 4: AED 123,500 heldUntil both tests pass
Held- Paid2.41M
- Due657k
- Held124k
- To build2.97M
Keep the specified tile
AED 0Change the tile We recommend
20,150After the screed it costs about 45,500.
LiveCAM 120 SEP 2026 · 10:42:07Second plaster gang started, north wall
14 people signed in
Bath 2 upstand rework started
Master-bath tile samples on site
- Paid2,405,000
- Verified, due656,500
- Held123,500
- Still to build2,965,950
Held until Tuesday's pressure test and the bath 2 flood test.
MEP first fix, ground floorLiving and bath 2 runs untested
188,50084,500Waterproofing, baths 2 and 3Bath 2 upstand too low
110,50091,000The specified tile was discontinued. Two options are on site as samples.
Keep the specified tile
AED 0Change to your selected tile We recommend
20,150+4 daysSame result at no cost, instead of variation V-05 at AED 11,050.
Before the scaffold comes down.
Laundry drainage moved
Agreed 52,000Two-coat waterproofing
Agreed 59,150Monthly site cleaning
Rejected 32,500+14 days135 days to go
Original 3 Feb 2027. A second plaster gang from 28 Sep aims to win back 5 days.
Pipe test and bath 2 re-check
Master-bath tiling, once the tile is decided
Ground-floor screeds, behind the flood test
Roof waterproofing, behind parapet render
The villa is sound and your money is protected, but the job is two weeks behind and one bathroom must be redone before tiling.
23 checks on this visit · 21 passed · 2 failed
1:04Week 15 walk-throughOne minute, six stopsConcrete, MEP first fix, windows, the ceiling before it closes, waterproofing, and our verdict.Plaster inspected, inside the recovery plan
Slab moisture 3.1%, screeds cleared
Blockwork measured, matches the claim to 0.4%
Protected, with attention needed
Eight-week trend · 61 → 69
CAM 1 liveUptime 99.8%20 SEP 2026 · 10:42:07Material trolley through the entranceCAM 1 · access
Movement at the bath 2 workfaceCAM 3 · motion
Delivery at the gate, 6 minutesCAM 1 · access
CAM 2 offline 40 minutes, power isolatedCAM 2 · signal
Ceiling AED 6,337,500
| Claimed | Verified | Conf. | ||
|---|---|---|---|---|
| PA-1 | 601,250 | 601,250 | 100% | paid |
| PA-2 | 780,000 | 780,000 | 100% | paid |
| PA-3 | 1,023,750 | 1,023,750 | 100% | paid |
| PA-4 | 780,000 | 656,500 | 94% | open |
| PA-5 | 871,000 | 695,500 | 81% | forecast |
Ground-floor screeds, behind the flood test
Roof waterproofing, behind parapet render
Use the menu inside the screen, and tap the cameras and photos. A preview of a sample villa.
Sign-in needed. Ask us for access on a free call.
1, 2 or 3 visits a week. A fixed fee.
Your fee is fixed when you sign, from your built-up area, your budget and how often we visit. It doesn't rise when your build costs more. These are the fees for a premium villa of 3,500 to 7,500 sq ft.A fixed fee, set when you sign. It doesn't rise when your build costs more. Premium villa, 3,500 to 7,500 sq ft:
Billed every 3 months in advance. Published prices, excluding VAT; your fee is set in your signed agreement. Other sizes and finishes are in the calculator.
NextWhere to startStart wherever you are today.
Four ways in. Each is useful on its own, and each leads to site visits if you want them.Four ways in. Each one leads to site visits if you want them.
Compare quotes
Free
Drop in your quotes. We show what's missing, what's priced high or low, and what each one really comes to.
Then, if you want it: a detailed quote report, AED 12,000, usually within 48 hours.
Pre-construction review
AED 15,000
Your contract, BOQ, programme, payment schedule and insurance checked before you sign, or before work starts.
Then site visits begin, at the frequency you choose.
Baseline survey
AED 15,000
What's built against what you've paid, zone by zone, so you know where you stand today.
Credited against your first 3-month bill.
Project roadmap
From AED 12,000
Scope, specification, drawing register, approvals route and a pricing schedule every contractor can price.
AED 25,000 for a new villa from the plot.
Your build, in ten minutes a week.
You don't have to attend meetings, chase updates or read long reports. We go to the site and the meetings for you. Once a week you get one brief with what matters, and you answer with a yes or a no.
- Site meetings attended for youWith the record sent to you: who said what, what was agreed, what's waiting on you.
- One weekly briefMoney, decisions, progress and quality, with photos behind every line.
- Decide with a yes or a noWe pass your decision to your contractor in writing, inside limits you set. We never decide for you.
- A weekly video walk-through and a callAt a time that suits you, in Dubai or anywhere else.
AED 6,000 a monthon top of your site visits, during the build
Held until Tuesday's pressure test and the bath 2 waterproofing fix.
Master bath floor tile change
Price checked against your contract rates: fair. The 4 days fit the current programme.
14 days behind the plan
Handover forecast 17 February. Plaster crew back to full strength next week.
Before you ask.
What does Vakeel actually do for me?
We check your builder's work before you pay for it. We visit your site 1, 2 or 3 times a week, inspect anything before it's covered, check every bill against the work actually done, and show it all on a live dashboard. On every bill you get a clear position: pay this, hold that, and why.
Why not just hire a project manager?
A project manager takes the day-to-day work off your hands, and for some owners that's the right choice. But they usually pick your contractor and suppliers, often from their own network, and referral fees or margins are common. With Vakeel you keep control, choose your own team, and see the truth before every payment. The full comparison is on the Why Vakeel page.
Do you handle payments?
Never. Your money never passes through Vakeel. We tell you what to pay or hold, and why; you pay your contractor yourself.
What does it cost?
A fixed monthly fee set from your built-up area, your budget and how often we visit. For a premium villa of 3,500 to 7,500 sq ft it's AED 18,000, 26,000 or 34,000 a month for 1, 2 or 3 visits a week, billed every 3 months in advance. It doesn't rise with your contract value. Prices exclude VAT.
I'm abroad, or just busy. Does this work for me?
Yes. Add Hands-off and we go to the site meetings for you. Once a week you get one brief with the money, the decisions, progress and quality, and you answer with a yes or a no. We pass your decision to your contractor in writing, inside limits you set. AED 6,000 a month on top of your site visits.