Villa A · wk 15/32
{{ clock }} GST · 3 FEEDS UP
PROJECT VA-01 · 2 VISITS A WEEK · WEEK 15 OF 32
Villa A, Jumeirah Islands
LAST INSPECTION
Sun 20 Sep · IN-1520
LAST REPORT
Sun 20 Sep · week 15
NEXT VISIT
Thu 24 Sep · 09:00
{{ t.kicker }}
{{ t.since }}
{{ t.big }}
{{ t.bigUnit }}
{{ st.v }}
{{ st.l }}
Project Health
FIVE DIMENSIONS · SCORED FROM THE RECORD · RECOMPUTED NIGHTLY
{{ overall }}
OF 100
OVERALL PROJECT HEALTH
{{ overallState }}
Money is sound and nothing is paid ahead of verified work. Time, quality and risk all carry open items — none of them structural.
EIGHT-WEEK TREND · 61 → 69
At a glance
ACT ATTENTION GOOD
{{ l.l }} {{ l.v }}
{{ glanceFoot }}
Claimed, verified, paid
GHOST = 30-DAY FORECAST
{{ t.label }} {{ t.aed }} {{ t.pct }}
Paid sits {{ safeGap }} below verified. You have never paid for unverified work.
Four months of the same three lines
CUMULATIVE · AED
JUNJULAUGSEPOCT FCST
CLAIMED VERIFIED PAID
Where you are in the 32 weeks
WEEK 15 · 47% ELAPSED · 17 WEEKS TO BASELINE
TODAY
W1 · 2 JUN 26W8W16W24W32 · 3 FEB 27
{{ i.l }}
{{ i.v }}
{{ i.s }}
Work remaining against the clock
BASELINE · VERIFIED · FORECAST
The green line is work we have actually verified burning down. It tracked the baseline until week eight, then flattened — that gap is the fourteen days, and the dashed line is where it lands if nothing changes.
Site, right now
On your side
RANKED BY COST OF WAITING
Vakeel does not instruct your contractor. Every action here is yours to take; we tell you what it is worth.
Since you last looked
FRI 18 SEP
{{ s.t }} {{ s.text }} {{ s.src }}
Vakeel inspects, analyses and reports. We do not build, we do not manage your programme, we take no commission, and no money of yours passes through us.
SYNTHETIC PRODUCT-DEMO RECORD · CAMERA STILLS AND SITE IMAGERY ARE REPRESENTATIVE DEMO MEDIA
LIVE CAMERAS · 3 CAMERAS · 549 FRAMES MATCHED TO INSPECTIONS
See the site whenever you want to
Three fixed cameras, recorded and kept. They show you what is happening; they do not replace a person standing in the room, which is why every frame we use in a position is matched to an inspection.
Camera is context. Inspection is verification.
No payment position rests on a camera frame alone. Positions rest on measured site evidence, test results and the signed record. Footage shown here is representative demo media, not a live feed from Villa A.
Recent camera activity
MOTION · ACCESS · SIGNAL · RETAINED IN THE RECORD
{{ c.t }} {{ c.e }} {{ c.c }}{{ c.kind }}
{{ curCam.id }} · LIVE · {{ clock }} GST
{{ curCam.name }}
{{ curCam.note }}
UPTIME
{{ curCam.up }}
FRAMES IN POSITIONS
{{ curCam.frames }}
TODAY · SCRUB THE DAY
{{ m.l }}
ACTIVITY BY HOUR · LAST 24 HOURS
0006121823
INSPECT · 14 VISITS · 47 HOURS · 312 CHECKPOINTS · 486 PHOTOGRAPHS
Before it's covered, we look
{{ d.v }}
{{ d.l }}
{{ d.s }}
{{ ringTotalText }}
CHECKPOINTS
Every checkpoint we have made
{{ r.l }} {{ r.n }} {{ r.pct }}
Claim accuracy by trade
Verified against claimed. The further from the edge, the less their word is worth.
{{ l.t }} {{ l.v }}
Inspection cover, zone by zone
Visits
Before it is covered
Nothing here should be closed up before we have seen it.
{{ c.t }} {{ c.when }} {{ c.tag }}
Checks before cover
{{ c.t }}{{ c.d }} · {{ c.ev }} {{ c.tag }}
Inspection outcomes, last six visits
PASSED · OBSERVATIONS · ACTIONS
{{ o.v }}
How accurate each trade's claims turn out to be
Verified against claimed, every application, this project.
{{ tr.t }} {{ tr.acc }}
INSPECTION {{ curInsp.id }} · {{ curInsp.rep }} · {{ curInsp.hours }} ON SITE
{{ curInsp.date }}
{{ curInsp.areas }}
VERDICT
{{ curInsp.verdict }}
CHECKPOINTS
{{ curInsp.checks }}
PHOTOGRAPHS
{{ curInsp.photos }}
VERIFIES
{{ curInsp.verifies }}
{{ curInsp.note }}
Checklist, with the photograph behind each
EVERY FRAME TIMESTAMPED ON CAPTURE
{{ it.ts }} {{ it.t }} {{ it.s }} SPECIFIED{{ it.spec }} MEASURED{{ it.got }} AGAINST{{ it.ref }} {{ it.v }}
Tests and measurements
{{ tt.t }}
{{ tt.r }}
Photographs from this visit
DROP YOUR OWN SITE PHOTOS INTO ANY TILE
ZONE {{ curZone.id }} · {{ curZone.insp }}
{{ curZone.n }}
{{ curZone.tag }}
VERIFIED
{{ curZone.ver }}
CLAIMED
{{ curZone.cl }}
GAP
{{ curZone.gap }}
LIVE READING
{{ curZone.sensor }}
Evidence in this zone
{{ e.text }}
{{ curZone.next }}
Frames and photographs
PROJECT · VILLA A, JUMEIRAH ISLANDS · AED 6.01M CONTRACT
What you are building, and where the money sits in it
{{ f.v }} {{ f.u }}
{{ f.l }}
THE BOQ, DISSECTED
Where the AED 6.01M actually goes
SOURCE · CONTRACT BOQ REV 03 · 1,842 LINES
{{ boqCenter.k }}
{{ boqCenter.v }}
{{ boqCenter.t }}
{{ boqCenter.s }}
BY PACKAGE · SHARE AND HOW MUCH IS BUILT
{{ g.g }} {{ g.amt }} · {{ g.pct }}
{{ g.built }}
Every trade, line by line
SHARE OF BOQVERIFIED BUILT
{{ r.t }} {{ r.note }} {{ r.amt }}{{ r.pct }} {{ r.prog }}
ANALYSE · AED 3.31M OF CLAIMS TESTED · 7 VARIATIONS BENCHMARKED · 11 RISK SIGNALS
What the numbers mean once someone checks them
Every application, scored line by line
CONFIDENCE SHOWN · 100% MEANS INSPECTED
Variations against your rates
Each price placed against the range in your contract rates and the other tenders. The green band is the middle half.
Every variation price, checked
Seven priced so far. Six were fair; one was not chargeable at all.
{{ v.t }} {{ v.n }}
WHAT-IF · INTERACTIVE
Turn any outcome on and watch where you land
RECOMPUTED LIVE
{{ w.l }}
{{ w.cost }} · {{ w.days }}
{{ wiCostPct }}
OF CEILING
FORECAST FINAL
{{ wiCost }}
HEADROOM
{{ wiHeadroom }}
HANDOVER
{{ wiDate }}
{{ wiVerdict }}
Contract to forecast, step by step
Every movement between what you signed and where it lands.
{{ w.l }} {{ w.amt }} → {{ w.cum }}
The shape of the cost outcome
4,000 simulations, plotted as a density. The tall part is where it most likely lands.
5.98MP50 6.191MCEILING 6.34M
Where every dirham of the contract sits today
AED 6.01M CONTRACT
{{ w.t }}{{ w.v }}{{ w.pct }}
How far each trade over-claims
Claimed minus verified, averaged across every application on this project.
{{ g.t }} {{ g.v }}
Money held, and holds lifted
Every hold has ended in a test, never in an argument.
{{ h.id }}
HELD HOLD LIFTED AFTER TEST
Where the final cost lands
4,000 simulations from your programme, contract rates and open risks, rerun nightly.
AED 6.04MP50 AED 6.191MCEILING 6.34M
Handover, by probability
Baseline 3 February. Modelled peak 17 February.
27 JAN17 FEB24 MAR
MONEY · NO FUNDS PASS THROUGH VAKEEL
What you have paid, and what you should not pay yet
CONTRACT
{{ contractText }}
CLAIMED
{{ claimedText }}
VERIFIED
{{ verifiedText }}
PAID
{{ paidText }}
FORECAST / CEILING
{{ forecastText }}
ceiling {{ ceilingText }}
VKL · FIN-01
LIVE
0 1.59M 3.19M 4.75M 6.34M
{{ dCenter.k }}
{{ dCenter.v }}
{{ dCenter.s }}
{{ dCenter.n }}
CONTRACT AED 6,012,500
CLAIMED BY CONTRACTOR AED 3,727,750
VERIFIED BY VAKEEL AED 2,825,875
PAID BY YOU AED 2,405,000
AED 0 FORECAST 6.191M ┆ CEILING 6.34M │
Claimed but not verified · AED 901,875 Verified, not yet paid · AED 420,875
VKL · HOLO-CORE · LIVE
TILT {{ coreTiltText }} · YAW {{ coreYawText }}
{{ dCenter.k }}
{{ dCenter.v }}
{{ dCenter.s }}
MOVE ACROSS TO TILT · CLICK A DISC TO LOCK
VKL · FLUX · MONEY IN MOTION
−2.28MTO BUILD−901.9KHELD BACK−420.9KNOT YET DUE SIGNED 6.01M CLAIMED 3.728M VERIFIED 2.83M PAID 2.40M
The stream narrows at every checkpoint. What leaks upward in red has not left your account.
Your villa, in 40 blocks
Each block is about AED 162,500
15 Paid by you AED 2,405,000 — all of it checked first
3 Checked, ready to pay AED 420,875 when the next bill is due
6 Stopped by us AED 901,875 asked for, but not built yet
15 Still to be built the rest of the villa
1 Spare AED 146,250 left under your limit
6.01M
3.728M
2.83M
2.40M
SIGNEDCLAIMEDVERIFIEDPAID
still to be built
−2,284,750
held back by us
−901,875
not yet due
−420,875
Each step down is money that has not left your account yet — and why.
CONTRACT 100% CLAIMED 62% VERIFIED 47% PAID 40% FORECAST 103% CEILING 105%
THE GAPS THAT MATTER
{{ dIntro }}
{{ dHint }}
READING · {{ dFocus.t }}
{{ fl.l }}{{ fl.v }}
CLAIMED, NOT VERIFIED 901,875
What the contractor says is done that we could not prove
VERIFIED, NOT YET PAID 420,875
Proven work you still owe — due on PA-4
NOT YET CLAIMED 2,284,750
Contract work still ahead of us
HEADROOM TO CEILING 146,250
Between the forecast and the most you said you would spend
TOTAL POSITION · NOW TO THE LAST DAY
EVERYTHING THIS VILLA WILL COST
{{ grandTotal }}
contract + your purchases + our fee
PAID SO FAR
{{ grandPaid }}
across all three
STILL TO PAY
{{ grandRemain }}
to retention due, Aug 2027
{{ m.v }} {{ m.l }}
Payment applications
5 SCORED · AED 156,650 HELD TO DATE
Variations
AGREED {{ approvedVarText }}WITH YOU {{ pendingVarText }}REJECTED {{ rejectedVarText }}
Month by month, to the last payment
Actuals to date, then forecast outflow on your contract's payment terms — fourteen days from each payment application, with 5% retention returned six months after handover.
{{ c.m }}
CLAIMED VERIFIED PAID
{{ s.m }} {{ s.tag }} {{ s.payText }} {{ s.ref }}
Your own purchases
Outside the contract. We count and check them on delivery; we never order, hold or pay for them.
TOTAL {{ purchTotal }}PAID {{ purchPaid }}PENDING {{ purchPending }}
{{ p.t }}{{ p.tag }}
{{ p.sup }}
{{ p.note }}
{{ p.amt }}
Our fee
2 visits a week, AED 26,000 a month, with 3 live site cameras at AED 1,500 a month. Billed every 3 months in advance, fixed at signing. Months beyond the agreed programme bill at the one-visit rate. Founding client: camera set-up included.
PAID {{ feePaid }}TO COME {{ feeToCome }}TOTAL {{ feeTotal }}
{{ f.m }}{{ f.n }}
{{ f.tag }}{{ f.amt }}
Our fee is 7.3% of what the villa costs you — and has held AED 156,650 of unverified claims so far, before counting the AED 32,500 variation we rejected as already in scope.
OUR POSITION · {{ curPos.id }}
CONFIDENCE {{ curPos.conf }}
{{ curPos.submitted }}
CLAIMED
{{ curPos.claimed }}
VERIFIED · PAY
{{ curPos.verified }}
HOLD
{{ curPos.held }}
Held until {{ curPos.holdUntil }}.
{{ curPos.summary }}
Line by line, with the evidence behind each
{{ l.n }}
CONF {{ l.conf }} {{ l.held }}
claimed {{ l.claimed }}verified {{ l.verified }}
{{ l.ev }}
Acknowledging records that you have read the position and what you paid. You pay the contractor directly — Vakeel never touches your money and never instructs them.
Recorded · sealed 0x33de…c410
It appears in your week 15 report and in the evidence chain. We will tell you the moment the hold clears.
Record what you paid
You pay the contractor directly from your own bank. Recording it here keeps your record straight and lets us reconcile the next application; nothing is sent from this screen.
PAYMENT RECORDED
{{ curPos.recLine }} It reconciles against the next application and appears in your weekly report.
This is analysis, not a position: the application has not been submitted. Nothing is due and nothing is held. It exists so the claim holds no surprises when it arrives.
Closed and sealed in your record. Nothing outstanding.
VARIATION {{ curVar.id }}
{{ curVar.t }}
CONTRACTOR'S PRICE
{{ curVar.price }}
OUR MEDIAN
{{ curVar.med }}
{{ curVar.n }}
PROGRAMME
{{ curVar.days }}
{{ curVar.why }}
{{ curVar.gap }}
{{ curVar.tag }}. It appears in your next weekly report; the instruction to the contractor stays with you.
PROGRAMME · A RECORD, NOT A SCHEDULE WE RUN
Week 15 of 32 · fourteen days behind
Dates belong to the contractor. We record the observed variance against what they issued, and model where that puts your handover. We do not set or chase the programme.
LATEST CONTRACTOR-ISSUED HANDOVER
3 February 2027
Baseline, unchanged in the contract record.
CONTRACTOR REVISION
Not issued
No revised date has been put to you despite the variance.
OUR OBSERVATION
17 February
Modelled from verified progress, not from their forecast.
The contractor's own programme, as issued
Imported from their Rev 02 bar chart, 28 May 2026. Grey is their baseline bar; clay is the slip we have observed past it. Their document, our measurement.
SOURCE · CONTRACTOR GANTT REV 02
JUN 26SEPDECMAR 27
{{ g.t }} {{ g.note }}
COMPLETE CONTRACTOR BASELINE OBSERVED SLIP TODAY
Critical path, planned against observed
Activity by activity, as recorded on inspection.
{{ c.t }}
PLANNED {{ c.plan }} · OBSERVED {{ c.obs }}
{{ c.vari }}
{{ s.t }} {{ s.w }} · {{ s.label }}
PLANNED VERIFIED BY INSPECTION 30-DAY FORECAST
What each outcome would mean
DECISIONS · 6 RECORDED · 3 OPEN
Yours to make. Ours to price.
Every decision carries its type, its severity, what it costs in money and days now against later, who raised it and when, and our recommendation with the reason. We record the outcome and report it; instructing the contractor stays with you.
OPEN WITH YOU
{{ openCount }}
IMMEDIATE
{{ critCount }}
RECORDED TO DATE
{{ recordedCount }}
YOUR AVERAGE TURNAROUND
{{ avgTurn }}
BY TYPE
{{ k.k }} {{ k.n }}
3 DAYS OR LESS THIS WEEK LATER DECIDED
Nothing is open. Everything we have raised has been decided and recorded.
Decision log
Every decision you have made on this project, with when it was asked, when you answered, and what it changed. Permanent.
{{ logCount }} RECORDED · AVERAGE TURNAROUND 3.3 DAYS · CLICK ANY ENTRY
{{ curLog.kind }} {{ curLog.id }} · {{ curLog.sub }}
{{ curLog.t }}
{{ curLog.why }}
{{ curLog.out }}
{{ curLog.amt }}
{{ curLog.amtLabel }}
REQUESTED
{{ curLog.raised }}
PROVIDED
{{ curLog.decided }}
TURNAROUND
{{ curLog.turn }}
DECIDED BY
{{ curLog.by }}
ORIGIN
{{ curLog.origin }}
AFFECTED
{{ curLog.affects }}
The options that were on the table
{{ o.chosen }} {{ o.rec }}
{{ o.l }}
{{ o.d }}{{ o.c }}
{{ o.w }}
WHAT WE ADVISED AND WHY
{{ curLog.note }}
WHAT IT CHANGED
{{ curLog.res }}
Requested to provided
{{ e.d }} {{ e.w }} {{ e.who }}
What it rested on
{{ doc.t }} {{ doc.d }}
{{ curDec.kind }} {{ curDec.id }} · {{ curDec.sub }}
{{ curDec.t }}
{{ curDec.whyRaised }}
CLOSES
{{ curDec.due }}
{{ curDec.sev }}
{{ curDec.daysNum }}
DAYS LEFT
RAISED
{{ curDec.raised }}
RAISED BY
{{ curDec.raisedBy }}
ORIGIN
{{ curDec.origin }}
CONCERNS
{{ curDec.concerns }}
AFFECTS
{{ curDec.affects }}
DECIDE NOW
{{ curDec.costNow }}{{ curDec.daysNow }}
DECIDE LATE
{{ curDec.costLater }}{{ curDec.daysLater }}
WHAT THIS DECISION IS ABOUT · PHOTOGRAPHED ON SITE
WE RECOMMEND · {{ curDec.recLabel }}
{{ curDec.recWhy }}
IF YOU DO NOTHING
{{ curDec.ifNot }}
History of this decision
When it was requested, every time we chased it, and when you answered.
{{ e.d }} {{ e.w }} {{ e.who }}
What this decision rests on
Everything we hold on file for it.
{{ doc.t }} {{ doc.d }}
SEALED IN THE EVIDENCE CHAIN · YOUR RECORDED OUTCOME APPENDS TO THIS LIST, IT DOES NOT REPLACE IT.
{{ curDec.outcome }}
RISK RADAR · 11 SIGNALS TRACKED · 5 ABOVE THRESHOLD
Things that have not gone wrong yet
Probability against consequence
CLICK A SIGNAL
CONSEQUENCE →
ACT NOW
NOTED ONLY
UNLIKELYEVEN ODDSPROBABLE →
BUBBLE SIZE = EXPOSURE (PROBABILITY × CONSEQUENCE) THE PHOTOGRAPH IS THE THING AT RISK TOP RIGHT DESERVES YOUR ATTENTION FIRST
{{ curRisk.t }}
PROBABILITY
{{ curRisk.p }}
{{ curRisk.lead }} · CONSEQUENCE {{ curRisk.impText }}
{{ curRisk.cap }} {{ curRisk.id }} · WHAT IS AT RISK
HOW WE SAW IT
{{ curRisk.why }}
IF IT HAPPENS
{{ curRisk.impact }}
WHAT WE DID: INSPECT, ANALYSE, REPORT
{{ curRisk.we }}
REPORT · 15 ISSUED · NONE LATE · EVERY FRIDAY 08:00 YOUR TIME
Written down, every week, whether or not there is news
What else we put in writing
4
PAYMENT POSITIONS
9
VARIATION VERDICTS
41
CHECKS BEFORE COVER
3,914
RECORD ENTRIES
{{ curReport.t }} · Villa A
{{ curReport.d }} · {{ curReport.meta }}
EXECUTIVE SUMMARY · {{ curReport.d }}
{{ curReport.exState }}
{{ curReport.exVerdict }}
{{ x.l }}
{{ x.v }}
{{ a.k }}
{{ a.st }}
{{ a.t }}
WHAT HAPPENS NEXT
{{ n.n }}{{ n.t }}
CLAIMED
62%
VERIFIED
47%
PAID
40%
PROGRAMME
−14 days
What we inspected
{{ curReport.verified }}
What we held
{{ curReport.held }}
What needs you
{{ curReport.needs }}
The 60-second video report
FILMED ON THE VISIT · TIMESTAMPED · 00:60
One continuous walk through the villa, in six timestamped segments: concrete, MEP first fix, window openings, the ceiling before closure, waterproofing, and our verdict to camera. Not a summary read out afterwards. Click any segment to play it.
SEGMENT NOT YET UPLOADED
IN-1520 · 20 SEP 2026 · SEG {{ curReport.segNo }}/6 · {{ curReport.segTime }} GST
VAKEEL · SITE VISIT
Quality record for this visit
{{ q.v }}
{{ q.l }}
INSPECTEDEvery element, measured, with our verdict
ANALYSEDWhat we worked out from it
{{ a.t }} {{ a.v }}
{{ a.f }}
REPORTEDWhat we put in writing, and to whom
{{ r.t }} {{ r.w }} {{ r.d }}
PROJECT RECORD · 3,914 ENTRIES · APPEND ONLY
Everything, in one place, yours to take
{{ d.t }} · {{ d.rev }}
{{ d.d }}
{{ d.tag }}
{{ a.t }}
{{ a.body }}
{{ a.s }}
{{ m.t }} {{ m.who }}
{{ m.spec }}
{{ m.state }}
{{ m.flag }}
{{ m.amount }}
{{ m.count }}
Every measurement, test, count and position is sealed when it is made, with its source. Corrections append; nothing is overwritten.
{{ c.h }} {{ c.t }} {{ c.who }} {{ c.when }}
The quote check you started with, 26 May 2026. Verdict: negotiate with Contractor A.
{{ q.t }}
{{ q.v }}
Your agreement with Vakeel
CLIENT SERVICES AGREEMENT AND ORDER FORM · SIGNED 28 MAY 2026 · 2 VISITS A WEEK · AED 26,000 A MONTH · BILLED EVERY 3 MONTHS
We inspect, we analyse and we report. We do not build, we do not manage your programme, we do not instruct your contractor, we take no commission from anyone, and no money of yours passes through us. We see, measure or test work before you pay for it, and every position is put in writing with the evidence behind it.
Notifications
{{ n.t }} {{ n.d }} {{ n.s }}
ASK · ANSWERS FROM YOUR RECORD ONLY
Ask anything. Nothing will be invented.
{{ m.q }}
{{ m.a }}
SOURCE · {{ m.c }}
More
OPEN TECHNICAL ACTIONS · 4 OPEN · 7 OF 9 CLOSED THIS MONTH
What the site owes the record
Raised by inspection, tied to a piece of evidence, owned by whoever must close it. We chase the evidence; the instruction to the trade stays with your contractor.
{{ tierLegend }}
{{ a.id }} {{ a.t }}
{{ a.tag }} {{ a.due }}
{{ a.note }}
RESPONSIBLE · {{ a.who }}EVIDENCE · {{ a.ev }}
CLOSED THIS MONTH
7 of 9
Two remain on the current inspection.
CAUGHT BEFORE COVER-UP
41
Items that would have disappeared behind finishes.
HELD AGAINST OPEN ACTIONS
AED 123,500
Hold lifted when A-201 and A-202 close.
EVIDENCE LIBRARY · 486 ITEMS · 68 FROM THE LATEST VISIT
Every claim traces to a thing we saw
Each item keeps its own reference, location, timestamp, the inspection item it belongs to and any action it raised. Nothing is edited after it is filed.
{{ curEv.id }} · {{ curEv.kind }} RECORD
{{ curEv.tag }}
{{ curEv.t }}
{{ curEv.note }}
LOCATION
{{ curEv.loc }}
CAPTURED
{{ curEv.when }}
INSPECTION ITEM
{{ curEv.ins }}
TRACEABILITY · THIS ITEM KEEPS ITS INSPECTION ITEM, LOCATION, TIMESTAMP AND ACTION HISTORY. CORRECTIONS APPEND; THE ORIGINAL IS NEVER REPLACED.
SITE MAP · SPATIAL EVIDENCE LAYER · CAPTURE 20 SEPTEMBER
Walk the record by location
Capture date, inspection items, open gates and evidence pins stay on one view of the building. Click a pin to open the evidence behind it.
VERIFIED GATE OPEN ACTION OPEN
LOCATION TIMELINE
20 Sep capture
Current. Previous captures 12 Sep, 9 Sep, 2 Sep.
KEY ZONES MAPPED
MEP · Bath 2 · Tiling · Exterior
Ten zones across three levels.
OPEN GATES
Retest + flood test
Do not tile bath 2 until closure evidence exists.
AVAILABLE · REPLIES IN ~22 MIN
YOUR VAKEEL TEAM
Site visits, twice a week
Tuesdays and Fridays · on Villa A since 2 June 2026
2
VISITS A WEEK
9
VISITS A MONTH
3
DAYS, LONGEST GAP
HOLD-POINT INSPECTIONS PAY OR HOLD ON EVERY APPLICATION SAME-DAY FAILURE ALERTS VARIATION CHECKS
Every visit is logged here: what was checked, the photos and the measurements.
VISITS TO YOUR SITE
30
HOURS ON SITE
98
ITEMS INSPECTED
312
PHOTOGRAPHS TAKEN
1,208
REPORT TURNAROUND
18h
NEXT VISIT
Thu 24 Sep · 09:00
What gets checked most
Share of checks on your site so far, by trade.
{{ k.l }}{{ k.v }}
The next three visits
{{ n.d }}
{{ n.t }}
{{ n.s }}
What we carry on every visit
{{ k.t }}{{ k.s }}
Independence
No commercial ties to your contractor, designer or suppliers. Every engineer on your site signs a conflict check, renewed every quarter. Vakeel is paid by you, never by anyone we inspect.
If a visit has to move
V
Same week, same checks
Moved within the week; you're told the day before
Messages
VAKEEL · FRI 12 SEP
The position on PA-4 is with you. Our view: hold the MEP line until Tuesday's pressure test on the living-room runs.
{{ m.who }} · {{ m.when }}
{{ m.text }}
{{ profInitials }}
SETTINGS · OWNER ACCOUNT
{{ profName }}
{{ profEmail }} · Villa A, Jumeirah Islands · 2 visits a week
Dashboard mode
Simple shows only the big picture, in plain words and large type. Advanced is the full command centre.
Your details
{{ profSaved }}
Edit any field to save. Changes to your name or address are confirmed by us before the next report.
Second owner
Give a spouse, partner or family office the same view. They can read everything; only you record decisions and payments.
Sara Khan · invited 22 September · read-only
How we reach you
{{ p.label }}
{{ p.sub }}
Alert thresholds
Below these, it waits for the weekly report. Above them, we tell you straight away.
{{ a.l }}{{ a.vText }}
Quiet hours, 22:00 – 07:00
Only a critical defect or a stalled payment breaks through
Appearance
Text size
Enlarges everything in the main view — figures, charts and text together
{{ scalePct }}
Region and format
{{ r.l }}
{{ r.hint }}
Sign-in and security
{{ s.l }}
{{ s.sub }}
Where you are signed in
{{ x.d }}
{{ x.w }}
{{ x.tag }}
Live cameras
{{ c.l }}
{{ c.sub }}
Keep recorded footage for
Frames matched to an inspection are kept for the whole project regardless
Take the whole record with you at any time: every inspection, photograph, test, position and document, with its timestamp and source.
THE DASHBOARD BEFORE WORK STARTS
Nothing has been claimed, verified or paid yet.
Villa A starts on 2 June. We walk the site the day before and open your record. Until then this screen stays quiet on purpose — three empty counters would be worse than silence.
INSPECTED
0
first visit 1 June
ANALYSED
0
first claim expected 4 July
REPORTED
0
first report Friday 5 June
Four things before the first inspection
Signed drawings uploadedA-101 Rev C, A-102 Rev B, E-204 Rev A · done 28 May
Payment schedule importedFive applications against the contract · done 29 May
Camera installSlot booked 1 June, 08:00 · three fixed cameras
First inspectionMonday 1 June, 09:00
The three truths appear after the contractor's first claim. Your money never passes through Vakeel.
{{ onbStepLabel }}
V
Compare your quotes, free.
Put two or three quotes side by side and see what looks high, what looks low and what is missing, on screen in seconds. We don't recommend contractors, and we take no fee from anyone but you.
Enter your quotes
Two or three, package by package. Your PDFs come to us only if you book the detailed report.
Contractor A quote.pdf · 2.4 MBATTACHED
Contractor B BOQ.xlsx · 410 KBATTACHED
Add a third quote
COMPARE QUOTES · ON SCREEN
AED 1,072,500 not firmly priced in Quote B.
The lowest quote isn't the cheapest. Quote B excludes waterproofing and MEP first fix; priced at what the others charge, it lands near AED 6,305,000. Indicative, based on what you entered. We don't recommend contractors.
Quote A — AED 6,012,500
Two omissions, one high line, nothing excluded. Closest to your scope.
Quote B — AED 5,232,500
Two exclusions: waterproofing and MEP first fix.
Quote C — AED 7,085,000
High: preliminaries at 18%, against 9% in the other two quotes.
Talk it through with us
Thirty minutes. We show you what we found and what we would do next. Times are in your time zone, London.
Mon 09:00
Mon 14:30
Tue 11:00
Wed 16:00
Choose how often we visit
Fixed at signing and billed every 3 months in advance. Months past the agreed programme bill at the one-visit rate.
Add-ons: live site cameras (3, 5 or 7), cost forecast, spot checks, material checks at the supplier, and Hands-off. Prices for a premium villa of 3,500 to 7,500 sq ft; prices exclude VAT.
Your agreement, in plain English
We inspect, we analyse and we report. We act only for you. We do not build, we do not manage your programme, we do not instruct your contractor, and we take no commission from anyone, ever. No money of yours passes through us. We see, measure or test work before you pay for it, and every position goes to you in writing with the evidence behind it. Your fee is fixed at signing and billed every 3 months in advance. You can stop before any block and the next block isn't charged.
2 VISITS A WEEK · AED 26,000 A MONTH · VILLA A, JUMEIRAH ISLANDS
Signed 22 September 2026. A copy is in your project record and in your email.
Your account
We sent a six-digit code to +971 50 ••• 0001.
4
1
8
0
You can add a second owner now or later. They see everything; only you record decisions and payments.
Your first week
How we inspect
Ninety seconds: what we check, how we record it, and when we're on your site.
Upload the signed drawingsDONE
Import the payment scheduleDONE
Camera install slot1 JUNE, 08:00
How we reach youWHATSAPP + EMAIL
First inspectionMON 1 JUNE, 09:00
Your record is open.
Nothing has been claimed, verified or paid yet. From the first inspection, everything we see lands here the same day — and the cameras go live on 1 June.
DESIGN NOTE
Three verbs, and nothing else
The structure is the service

Vakeel inspects, analyses and reports, so the dashboard opens with exactly three counters — visits and checkpoints, claims tested, reports issued — and every other screen belongs to one of them. There is no task list, no contractor chat, no programme you can drag. When something needs doing, the interface says what it is worth and whose job it is: yours.

The snapshot is built so the whole position reads in about fifteen seconds: three verbs, five state tiles (money, time, quality, decisions, risk), the three truths with a forecast ghost behind each, four months of the same three lines, the live site, what sits with you, and what changed since Friday. Every tile is a door; nothing on it is a dead end.

Colour and type carry the meaning

Espresso ground, ivory ink, and three inks that never mean anything else: platinum for claimed, green for verified, ivory for paid. Clay is held or waiting; rust is rework, rejection or a probability worth acting on. No red alarm — an owner three time zones away needs an instrument, not a siren.

Marcellus carries judgements and figures. JetBrains Mono in small caps carries machine speech: sources, timestamps, confidence, sensor and camera IDs. Jost carries anything a person wrote. You can tell at a glance whether a line is a measurement, an opinion, or a machine talking — which matters when the whole product is knowing what is actually true.

The cameras are evidence, not entertainment

Three feeds, a scrubbable day, and an activity strip by hour — and every frame used in a position is matched to an inspection, with the count shown. That framing keeps the cameras inside the three verbs: they are how we inspect between visits and how you see the site at 7am, not a substitute for someone standing in the room with a tape and a test kit. Drop your own site photographs into any tile and they stay put.

Week 15 of 32 · verified by Vakeel 20 Sep · signed in as {{ sFirst }}
Villa A, Jumeirah Islands
WEEK 15 OF 32
Villa A, Jumeirah Islands
{{ h.v }}
{{ h.l }}
Money at a glance
contract plus agreed variations
{{ g.l }}
{{ g.v }}
{{ g.s }}
{{ k.l }}
Live from site
Progress by week
checked by us builder says plan
100%75%50%25%0%
47%
builder says 52%
wk 1wk 8wk 16wk 24wk 32
Keys handed over
17 Feb 2027
builder says 3 Feb 2027 · 14 days behind
today
● builder's date● our forecast
{{ c.t }}
Needs you
Nothing waiting on you right now.
Next two weeks
{{ a.day }}
{{ a.mon }}
{{ a.t }}
{{ a.s }}
Arriving soon
{{ m.t }}
{{ m.a }}
{{ m.n }}
Week 15 of 32 · verified by Vakeel 20 Sep · signed in as {{ sFirst }}
Your money
Money at a glance
contract plus agreed variations
{{ g.l }}
{{ g.v }}
{{ g.s }}
{{ k.l }}
Your limit of AED 6,337,500
{{ k.l }}{{ k.s }} {{ k.v }}
Your next payment
AED 656,500
Due 1 October. We checked the work behind it.
We are holding back AED 123,500 until the pipe tests pass.
Payments still to come
{{ c.m }}{{ c.v }}
Our fee
AED 195,000
paid of AED 438,750
AED 48,750 a month until the keys.
Week 15 of 32 · verified by Vakeel 20 Sep · signed in as {{ sFirst }}
Your decisions
Things only you can decide. We tell you what we would do.
{{ d.day }}{{ d.mon }} {{ d.left }}
{{ d.t }}
We would choose
{{ d.recL }}
{{ d.recWhy }}
✓ Done. You chose: {{ d.chosen }}
Week 15 of 32 · verified by Vakeel 20 Sep · signed in as {{ sFirst }}
Your reports
Twice a week we visit, check the work and write it up for you.
{{ r.d }}
{{ r.t }}
{{ r.s }}
Week 15 of 32 · verified by Vakeel 20 Sep · signed in as {{ sFirst }}
Live from site
Live now
{{ sCamBig.name }}
{{ sCamBig.note }}
Week 15 of 32 · verified by Vakeel 20 Sep · signed in as {{ sFirst }}
Your villa
{{ f.l }}
{{ f.v }}
Where the building money goes
{{ b.t }} {{ b.amt }} {{ b.pctTxt }}
Site report · {{ sRep.d }} · Vakeel
{{ sRep.t }}
{{ sRep.state }}
{{ sRep.verdict }}
{{ f.l }}
{{ f.v }}
{{ sRep.segTime }} · {{ sRep.segName }}
The 1-minute video report
We walk the site and check the builder's work on camera.
How each part is doing
{{ a.k }} {{ a.st }} {{ a.t }}
What we checked
{{ sRep.itemSum }}
{{ i.note }}
Where · {{ i.loc }}
Checked against · {{ i.ref }}
Photographed · {{ i.ts }}
What happens next
{{ n.n }}{{ n.t }}
Week 15 of 32 · verified by Vakeel 20 Sep · signed in as {{ sFirst }}
Programme
{{ t.l }}
{{ t.v }}
{{ t.s }}
The builder's plan, and where we really are
planned done forecast running late
{{ m.l }}
{{ g.t }}
{{ g.st }}
today
Milestones
{{ m.icon }} {{ m.t }}{{ m.s }} {{ m.d }}{{ m.st }}
Why we are 14 days behind
{{ w.t }}{{ w.d }}
Your decisions that affect the date
Week 15 of 32 · verified by Vakeel 20 Sep · signed in as {{ sFirst }}
Documents
Every drawing, approval and legal paper for your villa — always the latest version.
{{ d.ext }} {{ d.t }}{{ d.meta }} {{ d.st }}
When a drawing is revised, the old one moves to "Superseded" and we tell you what changed. Nothing is ever deleted.
Settings
How much detail
Text size
Ask Vakeel
ANSWERS FROM THE VILLA A RECORD ONLY
{{ voiceLabel }}
“{{ voiceHeard }}”
{{ voiceErr }}
YOU ASKED
{{ lastQ }}
VAKEEL
{{ lastA }}
SAMPLE CONVERSATIONS · TAP TO HEAR
Ask anything about your villa — money, programme, inspections, decisions, risks. Every answer comes from the verified record, with figures and dates.
{{ m.who }}
{{ m.text }}
READING THE RECORD…
{{ lbItem.id }} · {{ lbItem.ev }} · INSPECTED ITEM
{{ lbItem.t }}
{{ lbItem.v }}
{{ lbItem.ts }}
{{ g.g }}
{{ lbItem.ts }}
MEASURED
{{ lbItem.m }}
LOCATION
{{ lbItem.loc }}
AGAINST
{{ lbItem.ref }}
VERDICT
{{ lbItem.v }}
{{ lbItem.note }}
Comments on this item
TIMESTAMPED · APPENDED TO THE RECORD
No comments yet. Anything you write here is timestamped and comes to us with the item attached.
{{ cm.who }} · {{ cm.when }}
{{ cm.text }}